Plumbing
Laying waste pipes in a renovation before the floor is strengthened
In a renovation we prepared and laid the waste pipes on the floor slab before the strengthening screed was poured.
- Where
- Milan
- When
- 2018
- Systems involved
- plumbing · drainage

What needed doing
The waste pipes had to go in before the structural strengthening of the slab, which would cover them.
What we did
We set out the routes and laid the waste pipes within the reinforcing mesh, with frames for the wall-hung fittings and the connections.
The result
When the strengthening screed was poured, the waste pipes were already in and connected.










