Skip to content

Plumbing

Second fix at the end of a renovation

At the end of a renovation we fitted the appliances: sanitaryware, showers, towel rails, electrical accessories and light fittings.

Where
Milan
When
2019
Systems involved
plumbing · electrical
Shower with overhead rose, mixer and hand shower fitted on grey tiles

What needed doing

With the floors and tiling finished, the appliances still had to be fitted.

What we did

In the bathrooms we fitted shower trays, mixers and shower heads, flush plates and towel rails.

In the rooms we fitted sockets, switches and wall lights.

The result

The flat has complete bathrooms and services, ready to use.

The service

Photos from the job

  • Kitchen wall with sockets and connections ready
  • Bathroom with the toilet just delivered, before fitting
  • Flush plate and white towel rail in the bathroom
  • Bathroom with shower tray and towel rail fitted
  • Bathroom with towel rail and sanitaryware connections
  • Room with the wall lights on
  • Entrance of the flat with sockets and switches fitted
  • Consumer unit with a sign saying “only touch the red lever”
  • Bathroom door and corridor at the end of the job
  • Shower with tray, mixer and rose, on grey tiles
  • Flush plate, towel rail and basin connections

All projects